Amazon Stockton NCL2

The background:

Halsall Mechanical and Electrical, a leading M&E Contractor, recently undertook the mechanical and electrical design and installation for a 2,000,000ft² Amazon Distribution Centre in the North East of England. As part of this project, Halsall utilized helicopters to lift the AHUs into position, ensuring a seamless and speedy, cost effective installation process. Additionally, we installed a wide range of M&E services within the warehouse and office areas, ensuring that the distribution centre was fully equipped to meet the needs of Amazon’s operations. Our expertise and innovative approach played a key role in the successful completion of this project, demonstrating our commitment to delivering high-quality solutions for the client.

Key features:

  • Packaged Integral Heat Pumps Systems with 18 Air Handling Units on the Roof
  • Air Source Heat Pump System though out two of the Main Office Blocks
  • Localised Water Heaters for Bumpout Domestic Areas
  • Kitchen Supply and Extract System
  • External Mains Cold Water
  • Warehouse Ventilation System
  • Controls package to Network the whole site
  • External Lighting
  • Internal Warehouse Lighting
  • Internal Warehouse Small Power and Data
  • Fire Alarm
  • Generators
  • HV / LV Distribution