TWININGS Tea Factory

Twinings_Tea_Factory300x200

Client

TWININGS Tea Factory


Project

Refurb Existing Building


Main Contractor

ADI


Design & Build

Halsall Mechanical


Contract Period

92 Weeks


Completion Date

2013

TWININGS Tea Factory

Refurb Existing Factory for Twinings Tea, comprising of the installation, testing and commissioning of the following Mechanical Services:

• H & V Controls
• Heating & Ventilation
• Above Ground Drainage Installation
• LPHW Pipework Installation
• Mains Water
• Chilled Water System
• Food Production Installation
• Stainless Steel Ductwork Installation