AG BARR Project MK

AG-Barr300x200

Client

AG BARR Project MK


Project

New Production Distribution Facility, Warehouse Offices and Ancillary Areas


Main Contractor

Simons Construction


Design & Build

Halsall - M & E


Contract Period

21 weeks


Completion Date

2013

AG BARR Project MK

New Production Distribution Facility, Warehouse Offices and Ancillary Areas, comprising of the installation, testing and commissioning of the following M&E Services:

• HV Distribution – 11 kv
• LV Distribution – 400 v
• Mechanical Plant And Control Panel Supplies
• Lighting Installation
• External Lighting Installation
• Lighting Controls
• Emergency Lighting Systems
• Small Power Installation
• Branch Computer System
• Energy Reduction Panel Installation
• Structured Cabling Installation
• Disabled Refuge Installation
• Disabled Alarm Installation
• Domestic Hot and Cold Water Services Installation
• H & V Controls
• Heating & Ventilation to; Main Offices, Welfare and Circulation Areas, Ops Offices.
• VRF Air Conditioning Installation
• Above Ground Drainage Installation
• LPHW Pipework Installation
• Internal Gas
• External Gas
• Mains Water
• External Hydrant Main
• Rainwater Harvesting Installation
• Solar Thermal Installation
• Frost Protection Installation to the Warehouse Area
• Production Area Extract System
• Sprinkler Infill Installation
• Supply & Install of 2x200M³ Capacity Cold Water Storage Tanks
• Sanitaryware Installation
• Achieved BREEAM Excellent Standard